Ae3000, PV plants.

Vila-sana's Solar Park

Located in the municipality of Vila-sana (Lleida) has a total power of 1.378,925 kWp and it spreads over an area of 32.000 square meters. It consists in galvanized steel and aluminum structures with 7.176 EVERGREEN modules, ES-190 y ES-195 with peak power of 190 W and 195 W, 12 SMA SC 100 inverters with 100 kW nominal output power, and up to 130 kWp input power.

upload

Empriu 3 Solar Park

Located in the municipality of El Palau d’Anglesola (Lleida) has a total power of 798.70 kWp and it spreads over an area of 44.000 square meters. It consists of 3780 SANYO modules HIP215-NHE5 with a peak power of 210W, 126 solar trackers DEGER ENERGIE 5000EL and 126 SMA SMC 6000 inverters with 5.500W nominal output power, and up to 7.000 kWp input power.

upload

Empriu 2 Solar Park

Located in the municipality of Bellvís (Lleida), has a total power of 680.40 kWp and it spreads over an area of 37.500 square meter. It groups 8 photovoltaic producers. It consists of 3.240 SANYO modules HIP210-NHE5 with peak power of 210W, 108 solar trackers DEGER ENERGIE 5000L and 108 SMA SMC 6000 inverters with 5.500W nominal output power and up to 7.000 kWp input power.

upload

Solar Park in El Palau d'Anglesola

Located in the municipality of El Palau d’Anglesola, it has 1161 kWp total power and it spreads over an area of 64.000 square meter. It is currently the biggest functional group of photovoltaic energy producers connected to the grid in Lleida, with more than 25 participating investors. It consists of 5.400 SANYO PV modules HIP215-NHE5 with peak power 215 W, 180 DEGER ENERGIE 5000EL solar trackers and 180 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Solar Park in Juncosa

Located in the municipality of Juncosa (Lleida), it has 1161 kWp total power and it spreads over an area of 59.000 square meter. It groups more than 20 phtovoltaic producers. It is currently under construction, ad it will connect to the grid in December 2007. It consists of 5.400 SANYO PV modules HIP215-NHE5 with peak power of 215 W, 180 solar trackers DEGER ENERGIE 5000EL and 180 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Solar Park in Golmés

Located in the municipality of Golmés (Lleida), it has 1.234 kWp total power and it spreads over an area of 60.000 square meter. It groups more than 30 phtovoltaic producers. It is currently under construction, and it will connect to the grid in December 2007. It consists of 5.880 SANYO PV modules HIP210-NHE5 with peak power of 210 W, 196 solar trackers DEGER ENERGIE 5000EL and 196 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Solar Park in Albesa

Located in the municipality of Albesa (Lleida), it has 604.8 kWp total power and it spreads over an area of 34.000 square meter. It is a functional group of photovoltaic energy producers connected to mains with 19 participating investors. It consists of 2.880 SANYO PV modules HIP210-NHE5 with peak power of 210 W, 98 solar trackers DEGER ENERGIE 5000EL and 98 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Panades Solar

Located in the municipality of de El Poal (Lleida) over 10.000 square meter, with 226.8 kWp power, it was connected to the grid in December 24, 2006. It accumulates a production of 487.716 kWh, which corresponds to 2.150 hours. It consists of 1.080 SANYO PV modules HIP210-NHE5 with peak power de 210 W, 36 solar trackers DEGER ENERGIE 5000EL made of galvanized steel, which serve as support structure for the aluminium frame to which the 30 SANYO PV modules -which form each photovoltaic subcamp- are screwed. It also consists of 36 inverters SMA SMC 6000 with 5.500 W nominal output power, up to 7.000 kWp input power.

upload

Bartolo Solar

Located in Bellvís (Lleida) it has a 100.8 kWp solar photovoltaic installation , with estimated yearly production of 210.000 kWh. It consists of 480 SANYO PV modules HIP210-NHE5 with peak power de 210 W, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

ILION - ROCA

Located in the municipality of Juneda (Lleida), it is formed by two solar photovoltaic installations. One has 100.8 kWp power and the other 56.7 kWp power, over an area of 20.000 square meter. They consist of 1.230 SANYO PV modules HIP210-NHE5 with peak power de 215 W y 210 respectively, 64 solar trackers DEGER ENERGIE 5000EL and 64 inverters SMA SMC 6000 with 5.500 W nominal output power, up to 7.000 kWp input power. This solar park has an estimated yearly production of 555.345 kWh.

upload

Novella Alta

Located in Vilassana (Lleida) with an estimated yearly production of 216.763 kWh, this 103,2 kWp photovoltaic solar installation consists of 480 SANYO PV modules HIP215-NHE5 with peak power de 215 W, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Salvia - Garrofé

Located in Palau d’Anglesola (Lleida) and connected to the grid in December, 29 2006, it has an estimated yearly production of 243.858 kWh. This 113,4 kWp photovoltaic solar installation consists of 540 SANYO PV modules HIP210-NHE5 with peak power 210 W, 18 solar trackers DEGER ENERGIE 5000EL and 18 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Enesol Miqueló / Bellart-Vidal

Share some land in the municipality ofPuig-grós (Lleida) where they have 98.4 kWp and 77.4 kWp installations respectively spread over an area of 8.000 square meter. Enesol Miqueló, SL consists of 480 SANYO PV modules HIP205-NHE5 with peak power 205, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power. It was first connected to the grid in April, 11 2006, and has an estimated yearly production of 211.601 kWh. Bellart-Vidal, SL consists of 360 SANYO PV modules HIP215-NHE5 peak power 215 W, 12 solar trackers DEGER ENERGIE 5000EL and 12 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power . It was first connected to the grid in March 15, 2007 and has an estimated yearly production of 166.442 kWh.

upload

Ballesté-Pau

Located in the municipality of Arbeca (Lleida), became connected in February 26, 2007. In the same premises there are three solar installations. One has 103,2 kWp power and the other 100,8 kWp power in an area of 20.000 square meter. They consist of 1.440 SANYO PV modules HIP215-NHE5 and 480 SANYO PV modules HIP210-NHE5 peak power 215 W and 210 respectively, 64 solar trackers DEGER ENERGIE 5000EL and 64 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power. This solar park has an estimated yearly production of 882.532 kWh.

upload

Granja Els Planells

Located in Artesa de Segre (Lleida), was connected in November 8, 2006 and has an estimated yearly production of 216.763 kWh. This 103,2 kWp photovoltaic solar installation consists of 480 SANYO PV modules HIP215-NHE5 peak power 215 W, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

SANFELIU

Located in the municipality of Bellpuig (Lleida) in an area of 10.000 square meter, this 226,8 kWp installation was connected to the grid in December 23, 2006. It has accumulated a production of 487.716 kWh, which means 2150 hours. It consists of 1080 SANYO PV modules HIP210-NHE5 peak power 210 W, 36 solar trackers DEGER ENERGIE 5000EL made in galvanized steel, which are used as support for the aluminium frame to which the 30 SANYO PV modules which form each photovoltaic subcamp are screwed. It also has 36 inverters SMA SMC 6000 of 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Nabau-Salvia

Located in Vila-sana (Lleida) was connected to the grid in in February, 10 2007 and has an estimated yearly production of de 216.763 kWh. This 103,2 kWp photovoltaic solar installation consists of 480 SANYO PV modules HIP215-NHE5 with peak power 215 W, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and to 7.000 kWp input power.

upload

CIC Altersol

Located in Sarroca de Lleida (Lleida) with an estimated yearly production of 216.763 kWh, this 103,2 kWp photovoltaic solar installation consists of 480 SANYO PV modules HIP215-NHE5 with peak power 215 W, 16 solar trackers DEGER ENERGIE 5000EL and 16 inverters SMA SMC 6000 with 5.500 W nominal output power, and up to 7.000 kWp input power.

upload

Les Borges Blanques

This 18,9 kWp plant connected to the grid consists of six solar trackers with 3,15 kWp each, high performance SANYO PV policrystalline modules and multi-step inverters that maximixe the yield of the installation. It has a yearly production of 39000 kWh, which is equivalent to a 2063 hours ouput.

upload

Installation in Golmés

This 96 kWp plant connected to the grid consists of 24 solar trackers solares with two axes of 4 kW each, SANYO PV modules and inverters SMA. SANYO PV modules offer the highest solar yield and best performance in the production of high temperatures in the market. It has a yearly production of 208.000 kWh, which is equivalent to 2166 hours.

upload

Granja El Palau d'Anglesola

This 18,9 kWp plant connected to the grid consists of 6 solar trackers with 3,15 kWp each, high performance SANYO PV polycristalline modules and mlti-step inveters to maximize the yield of the installation. It has a yearly production of 39.000 kWh, which is equivalent to 2063.